High Efficiency High Torque Helical Geared Motor

High Efficiency High Torque Helical Geared Motor

R series CZPTcal Geared Motor Attributes

one. Characteristics:

one. High efficiency: 92%-ninety seven%

 

2. Compact structure: Modest offset output, two stage and three stage are in the same box.

 

three. High precision: the gear is created of higher-top quality alloy steel forging, carbonitriding and hardening treatment, grinding method to guarantee large precision and stable running.

four. High interchangeability: highly modular, serial design, strong versatility and interchangeability.

2. CZPT parameters

Ratio 3.forty one-289.74
Enter electricity .twelve-160KW
Output torque 61-23200N.m
Output velocity five-415rpm
Mounting type Foot mounted, flange mounted, foot and flange mounted, one-phase foot mounted, single phase flange mounted, Flange-mounted with prolonged bearing hub
Input Strategy Flange input(AM), shaft enter(Advert), inline AC motor input, or AQA servo motor
Brake Release HF-guide launch(lock in the brake release place), HR-handbook release(autom-atic braking place)
Thermistor TF(Thermistor protection PTC thermisto)
TH(Thermistor security Bimetal swotch)
Mounting Situation M1, M2, M3, M4, M5, M6
Kind R17-R167
Output shaft dis. 20mm, 25mm, 30mm, 35mm, 40mm, 50mm, 60mm, 70mm, 90mm, 110mm, 120mm
Housing materials HT200 large-strength cast iron from R37,forty seven,fifty seven,67,77,87
Housing materials HT250 Large energy solid iron from R97 107,137,147,157,167,187
Heat treatment technology carbonitriding and hardening treatment method
Performance ninety two%-ninety seven%
Lubricant VG220
Protection Class IP55, F class

CZPTshine Travel

ZheJiang CZPTshine Push Co.,Ltd,the predecessor was a state-owned military mould company, was proven in 1965. CZPTshine specializes in the comprehensive power transmission resolution for substantial-conclude products production industries primarily based on the intention of “Platform Item, Software Design and Professional Provider”.
CZPTshine have a robust technological pressure with in excess of 350 workers at current, which includes over 30 engineering professionals, thirty good quality inspectors, covering an area of 80000 square meters and kinds of advanced processing equipment and screening equipments. We have a great foundation for the market software advancement and services of higher-conclude pace reducers & variators proudly owning to the provincial engineering technology investigation center,the lab of gear pace reducers, and the base of modern day R&D.

Our Crew

High quality Manage
High quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission  
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value

3. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective 
measures to prevent recurrence.

four. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
 found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.

5. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of 
customer expectations and needs.

six. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the 
item is a product inspection to determine the qualified products.

7. Certification.

Packing

Delivery

High Efficiency High Torque Helical Geared Motor